Hallingdal, Norway
Hydro
Re-investment
1958
-
228 GWh
60 MW
The Hol III hydropower plant is a run-of-river power plant located in Hallingdal, in Buskerud county, Norway. The power plant was put into operation in 1958, and utilizes a drop of 98 meters from Holsfjord. The plant is composed of two Francis turbines, with an installed capacity of 30 MW each. Annual production is approximately 228 GWh.