Friedenheim on the Crocodile River in Mpumalanga Province, South Africa, is a small 2.5 MW hydro power plant. It was installed in 1987 and registered with RECSA in 2010. The site was chosen as there was an existing canal and penstock on the river, contributing to the lowering of the capital costs for the hydro station as well as avoiding any environmental impact.