Byafossen

Byafossen is located in Steinkjer in Trøndelag County. The original plant from 1936 was demolished and replaced by a completely new dam and plant in 2018. With the new construction the annual output has increased from 20 to 36 GWh. Byafossen has two 6 MW Kaplan turbines.
FACTS
Location

Steinkjer, Norway

Technology

Hydropower

Attributes

Re-investment

Producing electricity since

2018 (1936)

Estimated annual generation

20 to 36 GWh

Total capacity

12 MW

Byafossen is located in Steinkjer in Trøndelag County. The original plant from 1936 was demolished and replaced by a completely new dam and plant in 2018. With the new construction the annual output has increased from 20 to 36 GWh. Byafossen has two 6 MW Kaplan turbines.